{"id":5334,"date":"2020-04-29T08:16:00","date_gmt":"2020-04-29T08:16:00","guid":{"rendered":"http:\/\/wings-architects.com\/?post_type=portfolio&#038;p=5334"},"modified":"2022-09-02T15:38:12","modified_gmt":"2022-09-02T15:38:12","slug":"office-building-in-shanghai","status":"publish","type":"portfolio","link":"https:\/\/wings-architects.com\/de\/portfolio\/office-building-in-shanghai\/","title":{"rendered":"B\u00fcrogeb\u00e4ude, Shanghai"},"content":{"rendered":"<p>Das Grundst\u00fcck des knapp \u00fcber 100.000 m\u00b2 gro\u00dfen Komplexes liegt im Bezirk Baoshan, Shanghai, an einer Hochbahntrasse. Neben der Optimierung der einzelnen B\u00fcrofl\u00e4chen und einer energieeffizienten Gestaltung, war daher ein wichtiges Planungsziel die Reduzierung der L\u00e4rmbel\u00e4stigung durch vorbeifahrende S-Bahn-Z\u00fcge. Die L\u00f6sung bestand darin, die Ausrichtung des Geb\u00e4udes in einem 45-Grad-Winkel zu \u00e4ndern und beide B\u00fcrot\u00fcrme gegen\u00fcber den Bahngleisen zu positionieren. Au\u00dferdem wurde die Verglasung des Vorhangfassadensystems auf der R\u00fcckseite des B\u00fcroturms minimiert.<\/p>","protected":false},"excerpt":{"rendered":"<p>The plot of the just over 100,000 m\u00b2 complex is located in Baoshan District, Shanghai, on an elevated railway line. In addition to the optimization of the individual office spaces combined with an energy-efficient design, an important planning goal was therefore the reduction of noise pollution from passing trains. The solution was to change the&hellip;<\/p>","protected":false},"author":1,"featured_media":5336,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"portfolio_category":[34],"portfolio_tag":[],"class_list":["post-5334","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-offices-campus"],"acf":[],"aioseo_notices":[],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio\/5334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/comments?post=5334"}],"version-history":[{"count":9,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio\/5334\/revisions"}],"predecessor-version":[{"id":7389,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio\/5334\/revisions\/7389"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/media\/5336"}],"wp:attachment":[{"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/media?parent=5334"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio_category?post=5334"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/wings-architects.com\/de\/wp-json\/wp\/v2\/portfolio_tag?post=5334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}